Clydach depot Lock 1

Tuesday 17th October: Work parties meet at Brownsters Cafe, High Street, Clydach between 8.00 and 9.00am. Work starts at two sites at 9.30am.

1. Clydach Lock: Backfill behind the sleepers, bolt in the sleepers to timbers (postponed from last week)

2. Old Highways Depot: Posts for HERAS security gates to be put in place.  Photo  above shows the ‘buried lock’ in the depot as it was before burial. We are determined that it will be resurrected.