Loading Map....

Date/Time
Date(s) - 26/08/2014
9:30 am - 1:30 pm

Location
Trebanos Lock

Categories


Depending on the weather work will be at either Trebanos Locks if the weather is good or Clydach Aqueduct if it is bad. If in doubt ring Gordon in the morning for confirmation. 07794534563

Work at Rebanos will include:-

1. Building a new stone wall at the by-wash exit (off-side) to the lower lock. The base is now prepared and the stone delivered. Lime and sand for pointing also came at the same time. Wellingtons essential.

2. Filling sand bags for back filling the new tow path edge south of the Pontardawe Playing Fields. The silt from the stream next to the wall can be used. Wellingtons essential.