The Canal Beneath Our Feet: Work on the Clydach Depot 7.2.17

Highways Depot

The Canal Beneath Our Feet: Work on the Clydach Depot 7.2.17

Highways Depot                 Not too much work, actually, but we did a bit of prep anyway. Until the mains utilties are isolated from the building to be demolished and we have delivery of the HERAS security fencing, and we know  when the demolition firm are ready to go, we can but tinker.

Here Gordon, Gareth and Toby solemnly hold a token first wooden upright pole in place. The poles will hold the security fencing round the building and ensure the cycle path remains safe and open. We have 135 of the poles. The manual digging of the first hole told us that a pneumatic drill will be needed to do the rest. We have one. There is tarmac on top of concrete before we reach soft soil beneath.  Anyway. once we had taken a souveinr photo, we removed the  pole and filled in the hole again.  A Bernard Cribbins song about a hole in the road came immediately to mind.

Job done. And undone. But knowledge gained.

 

 

 

 

Recent Post

The Week Ahead: Sunday 12th – Saturday 18th July 2026

Sunday 12th July: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 7th July 2026

On this beautiful day, the volunteers laboured under the hot summer's sun in two locations – the Buried ...
Read More

The Week Ahead: Sunday 5th – Saturday 11th July 2026

Sunday 5th July: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 30th June 2026

A big day at the Swansea Canal Centre today as we tidied up outside in preparation for the ...
Read More

The Week Ahead: Sunday 28th June – Saturday 4th July 2026

Sunday 28th June: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 23rd June 2026

Phew, what a scorcher! With the mercury creeping up to 30ºC and high humidity a smallish group of ...
Read More