Waterways Recovery Group: The Countdown Begins.

Waterways Recovery Group: The Countdown Begins.

[singlepic id=1581 w=320 h=240 float=none]

It is now just four weeks before the volunteers of the Waterways Recovery Group will arrive from all over the United Kingdom and Europe to continue restoring the Trebanos Locks. The two camps will last a week each and each will be led by a different WRG leader. Both leaders took the opportunity to visit the work site today (June 14th). We thank George Rogers and Bob Crow for making the long journeys from Derby and Oxford to spend a few hours on the Swansea Canal. Their dedication is much appreciated.
They were joined at the locks by John York, the Chief Engineer of the the Canal and River Trust for Wales and the South West. We thanks him too for coming all the way from Gloucester. They discussed the work that can be done on the two locks.
The photo above shows them in front of the lower lock chamber which will be emptied to allow coping stones and other debris to be removed from it. From left to right are John York, Bob Crow and George Rogers.

[singlepic id=1583 w=320 h=240 float=none]
Here Bob and George are seen discussing the results of the Trebanos Locks silt sample analysis done by the University Of Swansea which will determine how the silt from the chamber can be disposed of.

Recent Post

Work Party: Tuesday 18th August 2026

The volunteers met today at the Buried Lock for a two-pronged attack on the canal. Firstly, James and ...
Read More

Weed Between The Locks: Monday 17th August 2026

Alan and James accompanied John as he struggled to find a way through the weed between the Buried ...
Read More

The Week Ahead: Sunday 16th – Saturday 22nd August 2026

Canoe and kayak hire is currently up and running Please check our Facebook page for updates Sunday 16th ...
Read More

Work Party: Tuesday 11th August 2026

Another scorching day saw a three-pronged attack on the canal. First up, the gardeners, Christina, Diane, Jean and ...
Read More

Canoe and Kayak Hire Recommences on Sunday 9th August

Canoe and kayak hire will recommence on Sunday 9th August Please check our Facebook page for updates Sunday ...
Read More

The Week Ahead: Sunday 9th – Saturday 15th August 2026

Boating remains suspended due to the severe lack of water. Check our Facebook page for updates. Tuesday 11th ...
Read More