Work Party 23.6.15

WORK PARTY 23.6 (6)

Work Party 23.6.15

WORK PARTY 23.6 (10)
The beautiful weather brought out our volunteers in great numbers. We had two main aims; to start repointing the lock chamber at Clydach and to clear some of the canadian pond weed north of the lock. We achieved both of these aims. The lime mortar mix was made up at the Hebron Road depot and brought on the trailer in large buckets. This saved having the concrete mixer on site where space is limited. It is a source of satisfaction that we have now commenced repointing in both the Lower Trebanos Lock and the Clydach Lock.

Great progress was made in increasing the flow of water down the channel north of the lock. If the Pondweed gets too dense then the water to Vale Inco nickel works is reduced and production is threatened. More importantly, the fishstocks in the canal are at risk.

 

WORK PARTY 23.6 (17)WORK PARTY 23.6 (16)

Recent Post

Work Party: Tuesday 18th August 2026

The volunteers met today at the Buried Lock for a two-pronged attack on the canal. Firstly, James and ...
Read More

Weed Between The Locks: Monday 17th August 2026

Alan and James accompanied John as he struggled to find a way through the weed between the Buried ...
Read More

The Week Ahead: Sunday 16th – Saturday 22nd August 2026

Canoe and kayak hire is currently up and running Please check our Facebook page for updates Sunday 16th ...
Read More

Work Party: Tuesday 11th August 2026

Another scorching day saw a three-pronged attack on the canal. First up, the gardeners, Christina, Diane, Jean and ...
Read More

Canoe and Kayak Hire Recommences on Sunday 9th August

Canoe and kayak hire will recommence on Sunday 9th August Please check our Facebook page for updates Sunday ...
Read More

The Week Ahead: Sunday 9th – Saturday 15th August 2026

Boating remains suspended due to the severe lack of water. Check our Facebook page for updates. Tuesday 11th ...
Read More