Work Party 23.6.15

WORK PARTY 23.6 (6)

Work Party 23.6.15

WORK PARTY 23.6 (10)
The beautiful weather brought out our volunteers in great numbers. We had two main aims; to start repointing the lock chamber at Clydach and to clear some of the canadian pond weed north of the lock. We achieved both of these aims. The lime mortar mix was made up at the Hebron Road depot and brought on the trailer in large buckets. This saved having the concrete mixer on site where space is limited. It is a source of satisfaction that we have now commenced repointing in both the Lower Trebanos Lock and the Clydach Lock.

Great progress was made in increasing the flow of water down the channel north of the lock. If the Pondweed gets too dense then the water to Vale Inco nickel works is reduced and production is threatened. More importantly, the fishstocks in the canal are at risk.

 

WORK PARTY 23.6 (17)WORK PARTY 23.6 (16)

Recent Post

Work Party: Tuesday 9th June 2026

Today's gathering offered a range of tasks for our volunteers - there was something for every taste at ...
Read More

The Week Ahead: Sunday 7th – Saturday 13th June 2026

Sunday 7th June: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 2nd June 2026

The weather forecast for today was grim so we decided to abandon plans for concreting and instead returned ...
Read More

The Week Ahead: Sunday 31st May – Saturday 6th June 2026

  Sunday 31st May: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last ...
Read More

Work Party: Tuesday 26th May 2026

Phew, what a scorcher! With the mercury hovering around 30°C we took to the relative shade offered by ...
Read More

Summer Fair 2026

We are delighted to announce our Summer Fair for 2026. Join us at the Swansea Canal Centre for ...
Read More