Work Party Tuesday 8th January 2019

in-action

Work Party Tuesday 8th January 2019

This week’s working party, our first in the new year, took place up at Ynysmeudwy Upper and Lower locks (numbers 12 and 13 respectively).  We continued the task of removing encroaching weed from the pound between the upper and lower locks.  The massive build-up of sedge, couch grass and rye grass had reduced the width of the canal by two thirds and had allowed an unwanted build-up of silt.  The aim was to increase the area of open water and, in so doing, allow the current flow to scour the silt from the open channel.

The weather was perfect for the time of year with no sign of rain and a comfortable working temperature.  We were fifteen strong and eager to get started.  We had a common goal but chose an interesting variety of methods to achieve a successful result.

Ronnie & Gill

John A. Davis and Dominic opted for the trusty long-handled drag forks and were able to clear weed all the way along the canal edge on the tow-path side.  Gill and Ronnie used shovels to remove weed and debris from the edge of the tow-path.

John lends a helping hand

Meanwhile Gordon and his team set up the ‘mechanical dragging rake’ to tackle a massive build-up on weeds mid-stream.  This weed encroachment is too far from either bank to reach using conventional handheld implements so Gordon’s, 1 metre wide, mechanical rake is dragged across the canal using a system of block and tackle.  The resulting mechanical advantage of five to one means the 1 cwt, or 50 kilograms of weed is removed with each pass.  The photos show Gordon, John, Alan and Mike doing sterling work with this ingenious device and in the process they cleared approximately thirty square metres of encroaching weed.

20181204_124313

 

 

 

 

loading barrow

 

 

in action

Yet another method of weed removal was successfully undertaken by Martin, Gareth and Michelle as seen in the photo.  By use of a ‘Youngman’s Board’, a wheelbarrow and shovels they were able to stand on the compacted weeds ‘in the middle of the canal’, dig out blocks of weeds and silt, transport it safely out of the canal and deposit it on the off bank.  A significant area of open water was thus created.

A much-welcomed break for tea, coffee and cake was taken at eleven o’clock, after which, further work continued until one o’clock.  The gathering-up and cleaning of the tools was then meticulously carried out.  The final group photo is testimony to the satisfaction and collective feeling of a ‘job well done’.

 

20190108_114754

 

 

 

 

20190108_12235120190108_122405(1)   

 

 

 

 

 

 

by Michele Davidson and Paul Rapsey

Recent Post

Work Party: Tuesday 18th March 2025

Another chilly but very sunny morning and another session split between the Swansea Canal Centre and Coed Gwilym ...
Read More

“Step By Step” Guides

Take a look at these fabulous “Step-By-Step” guides to exploring the sections of the Swansea Canal that remain ...
Read More

The Week Ahead: Sunday 16th – Saturday 22nd March 2025

Tuesday 18th March: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More

White Rock Industrial Heritage Park Survey

White Rock Industrial Heritage Park Looking to the Future - Please let us have your Thoughts and Ideas. ...
Read More

Work Party: Tuesday 11th March 2025

This week the weather was bright and sunny but distinctly chilly. The volunteers attacked the canal on two ...
Read More

Canal Wildlife Walk – Saturday 26th April 2025

We are excited to be taking part in the City Nature Challenge 2025. Last year's event was a ...
Read More