There was a change of plan from the scheduled tasks for this Sunday. Work at the Coed Gwilym canoe store in preparation for the hire season starting at Easter, was put on hold as the sun shone upon our small group of volunteers.

With excavation work now moving apace at the Buried Lock site, the team began lining the second side of the new by-wash with a stone facing. The channel will be needed soon as the water flow is rerouted from the old culvert, so now is the time to do it.

Alan was on mortar mixing duty whilst Mike and Steve laid the stones, which have been recycled from the excavated spoil. Its hard on the knees, as both chaps testified, but a good stretch was completed before the skies darkened around lunchtime.

Several coffee breaks gave time for a chat and a rest for the arms (and knees) and it was a warm and worthwhile morning. We will be back on site this coming Tuesday with a larger group to continue the job, weather permitting.

Recent Post

Work Party: Tuesday 23rd June 2026

Phew, what a scorcher! With the mercury creeping up to 30ºC and high humidity a smallish group of ...
Read More

The Week Ahead: Sunday 21st – Saturday 27th June 2026

Sunday 21st June: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 16th June 2026

Weather-wise, today started off with a bit of drizzle that soon passed leaving the morning oppressively muggy. Most ...
Read More

The Week Ahead: Sunday 14th – Saturday 20th June 2026

Sunday 14th June: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 9th June 2026

Today's gathering offered a range of tasks for our volunteers - there was something for every taste at ...
Read More

The Week Ahead: Sunday 7th – Saturday 13th June 2026

Sunday 7th June: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More