Demolition Day: 11.6.17 Addendum

Buildings being demolished over the line of the old canal 2017.

Demolition Day: 11.6.17 Addendum

demolition 11.6.17  Thanks to so many of you for ‘liking’ the last blog on the JCB work in the Old Highways Depot and The Triple Work sites. I felt a bit of a cheat not having a photo of the building to be demolished by the JCB so here on the left is a more comprehensive picture. As you can see, the building on the right needs only the roof gable ends and ceiling struts to be removed. The part of the building over the lock is behind the JCB though our contractors are happy to take to whole building down and remove all rubble. For this we are very grateful.

 

As I explained in ‘The Canal Beneath our Feet (10)’ the portakabin on the left will not be demolished but put on rollers and taken to the corner of the depot away from the towpath  reconstruction. It will be the Swansea Canal Society HQ for the duration of the work. I do hope that makes things clearer.

Recent Post

Work Party: Tuesday 4th November 2025

There was a fantastic turn-out of volunteers today at the Swansea Canal Centre, made all the more amazing ...
Read More

“Spooky” – 2nd November 2025

A bright day saw the 2025 season of canoe and kayak hire draw to a close with our ...
Read More

Christmas Quiz 2025, Thursday 11th December, 7pm.

Join us for our second annual Christmas Quiz. Full details in the poster. Remember to purchase your tickets ...
Read More

The Week Ahead: Sunday 2nd – Saturday 8th November 2025

Sunday 2nd November: “Spooky” in Coed Gwilym Park. The grand finale of canoe and kayak hire for 2025. ...
Read More

Work Party: Tuesday 28th October 2025

This week, the volunteers returned to the Swansea Canal Centre to continue to create the community garden. The ...
Read More

Local History Book Fair, Swansea Museum, 8th November 2025

The Royal Institution of Wales is holding its annual Local History Book Fair in the Swansea Museum on ...
Read More