Two work parties today enjoyed slightly overcast but pleasantly mild weather as they set forth, one group in Coed Gwilym Park and the other in the Swansea Canal Centre. |
|
|
In the park, Dave made a great job of trimming the grass around the railings. |
![]() |
![]() |
Christina and Moira worked hard to tidy the flower beds, although there were occasional difficulties distinguishing between plants and weeds. |
|
Able seamen Mike and Duncan took to the water in the very stable platform of a double canoe. They hauled out sunken timber and cut back branches that John Gr, Sue and Andy tidied away. The cut is now much clearer for the canoes & kayaks. |
|
![]() |
![]() |
![]() |
![]() |
|
On the way back to base, they paused to admire a wonderful Easter display. |
![]() |
|
Meanwhile, at the Swansea Canal Centre in Hebron Road: |
|
|
Gordon, Phil, Lance and Chris pulled weed from part of the channel using a rake and pulley system. |
![]() |
![]() |
John Gw and Martin used a rope across the cut to pull the drag rack into position ready for another sweep. |
|
Bob cleared residual weed from the boat basin. |
![]() |
![]() |
Sharon tidied the towpath and earthed-up some of the plants and shrubs. |
|
Coffee break started as a quiet affair before the gardening and canoeing contingent working at Coed Gwilym Park arrived (cakes by Margaret). |
![]() |
![]() |
The ancient mariners, Bob and John Gw, had a trial voyage from the boat basin to Pont John aqueduct after the weeds had been removed to create a channel. You can see a short video taken by Paul here. |
|
Two work parties working hard at two locations is the way to get the best out of our merry bunch of volunteers. Keep it up chaps! |
|