Work Party 23.6.15

WORK PARTY 23.6 (6)

Work Party 23.6.15

WORK PARTY 23.6 (10)
The beautiful weather brought out our volunteers in great numbers. We had two main aims; to start repointing the lock chamber at Clydach and to clear some of the canadian pond weed north of the lock. We achieved both of these aims. The lime mortar mix was made up at the Hebron Road depot and brought on the trailer in large buckets. This saved having the concrete mixer on site where space is limited. It is a source of satisfaction that we have now commenced repointing in both the Lower Trebanos Lock and the Clydach Lock.

Great progress was made in increasing the flow of water down the channel north of the lock. If the Pondweed gets too dense then the water to Vale Inco nickel works is reduced and production is threatened. More importantly, the fishstocks in the canal are at risk.

 

WORK PARTY 23.6 (17)WORK PARTY 23.6 (16)

Recent Post

Work Party: Tuesday 10th November 2026

A cold and drizzly Tuesday morning, probably right for the time of year but quite a change from ...
Read More →

The Week Ahead: Sunday 8th – Saturday 14th November 2026

Tuesday 10th November: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More →

Work Party: Tuesday 3rd November 2026

Not all our colleagues were available this cool autumn morning, but at the Clydach Lock half a dozen ...
Read More →

The Week Ahead: Sunday 1st – Saturday 7th November 2026

Tuesday 3rd November: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More →

Work Party: Tuesday 27th October 2026

Today the volunteers worked in and around Coed Gwilym Park. The weather was unseasonably warm but interspersed by ...
Read More →

The Week Ahead: Sunday 25th – Saturday 31st October 2026

Tuesday 27th October: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More →