Today saw our volunteers having more fun in the sun at the Hebron Road Canal Centre.
|
|
![]() |
![]() |
|
John Gw installed a handy indoor tap to the existing water main in the workshop. |
![]() |
![]() |
Sharon and Pete assembled eight new chairs for the meeting room. |
|
James, John Gr, Ian and Phil set out a path between the two concrete slabs laid last week, and edged it with timber formwork using pegs which Gary and Phil had hewn from timber offcuts.
|
![]() |
![]() |
![]() |
|
Alan, James and Pete installed 15m of safety railings along the back of the boat basin. Gordon cut all the tubes and the job was finished before lunchtime. |
![]() |
![]() |
Moira spoilt us at coffee break with a wide choice of sandwiches, rolls and cakes, and David Morgan from Glandŵr Cymru called in for a chat. |
|
The Old School Nursery garden centre delivered a bulk load of landscape bark – thank you Lee! As the final job of the morning, Phil and Ian laid more membrane and spread the bark as a weed suppressant around the first slab. |
|
![]() |
![]() |
|
Great teamwork brought great results today, and we should get the new seating area completed next time. |
|