Work Party: Tuesday 24th November 2026
|
Bit of a rain today! The volunteers met at the Buried Lock as planned but it was obvious that there would be no concreting or pointing. Here they are glumly assessing the situation before splitting into three groups. |
![]() |
|
Kev, Dave and Andy were tasked with retrieving an old speedboat from the furthest corner of the Buried Lock site. They struggled to get it on the move on its side and then across a makeshift bridge over the by-wash before the cavalry arrived in the shape of John and Lance. With help from them and some rollers the boat was quickly pulled up to its temporary resting place. Later it will be moved to Coed Gwilym Park where it will be turned into a raised planter. |
|
![]() |
![]() |
|
Sharon, Chris and James scraped out the joints between the stones of the Mond Lock walls. Lime mortar pointing will be done once the weather improves. Gordon removed a giant buddleia that had forced some of the stones out of position. They will need resetting before the new gates can be hung. |
![]() |
![]() |
![]() |
|
Just up from the Mond Lock, Alan, Pete and John anchored the Nico-span in place by replacing the rusty wire with new, stainless steel wire. |
![]() |
![]() |
Kev, Dave and Andy hauled brash out of the silt bank. |
|
Tea was taken in the welcome shelter of the Canal Centre. Christina provided the delicious cakes. |
![]() |
![]() |
Moira and Chris spent time decorating the Centre ready for Saturday’s Christmas Market, |
|
The rain more or less stopped after tea so we were able to continue with our tasks at the Mond Lock. A wet day yes, but productive too. |
|