Work Party: Tuesday 7th July 2026
|
On this beautiful day, the volunteers laboured under the hot summer’s sun in two locations – the Buried Lock Site and Coed Gwilym Park. Two major tasks in the Buried Lock Site: Firstly, we tackled the by-wash walls. Gordon mixed the concrete, Kev and Phil transported it to the end of the by-wash, John, Phil, Aled, Kev and Andy gathered stones and Lance, James and John set them in place. So nearly finished – one more mix should do the trick! |
|
![]() |
|
![]() |
|
![]() |
|
|
Gordon continued to face with good stone the dividing wall between the boat basin and the lead-in to the lock. |
|
|
![]() |
|
Meanwhile, the gardeners were hard at work in Coed Gwilym Park. |
|
|
Gary weeded beneath the rails. |
![]() |
![]() |
Gary, Jan, and Chris cleared the forecourt. |
![]() |
![]() |
|
Moira, Jean, Jan and Diane tidied the flower beds. |
![]() |
![]() |
![]() |
|
Tea was taken in the park with tasty cakes and the world-famous cheese scones baked by Jan. |
|
![]() |
|
|
Work continued after tea in both locations. The final task was left to Roxi – one more stick to deal with! |
![]() |