Work party at Clydach Lock 5.9.17.

Sound timbers smiilar to these scaffoding planks will be floated down the canal saving transport costs and reusing a valuable resource.

Work party at Clydach Lock 5.9.17.

clydach04

With the scaffolding in place over the Clydach Lock chambe,r work could safely start on replacing the rotten sleepers along the length of the  off-side. Having cleared the vegetation and buddleia growing over the sleepers the rotten timbers were taken out. The new sleepers were cut and  the loose stones in the wall crowbarred out ready for the replacement wood.

clydach05IMG_20170905_130848952_HDR   HERAS fencing arrived to make the site secure (right) and the top coping stones checked for a perfect level. The dressed stone of the original top line wass so well cut and laid  two hundred and twewenty years ago that not one was out of true.

The new sleepers were placed in position (bottom right of the left hand photo) to gauge where the reinforcing timbers should be placed to run at right angles into the embankment towards the house.

The Evening Post cameraman  was there to record it all and  was caught on camera himself in the top photo with his zoom lens at the ready.

Recent Post

The Week Ahead: Sunday 26th July – Saturday 1st August 2026

Sunday 26th July: Canoes & Kayaks HIRE IS CANCELLED. Please accept our apologies for the inconvenience.. Tuesday 28th ...
Read More

Work Party: Tuesday 21st July 2026

Another scorching day for another session of canal clearing between the Canal Centre and Pont John. We were ...
Read More

The Week Ahead: Sunday 19th – Saturday 25th July 2025

Sunday 19th July: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 14th July 2026

Our volunteers split again this week across two locations, the Buried Lock and the Pont John area in ...
Read More

Green Flag Community Award 2026/2027

We've done it again! We have been awarded the Green Flag Community Award for the eleventh year. We ...
Read More

Canoe & Kayak Hire [Fridays]

The Friday sessions of canoe and kayak hire run from 24th July to 28th August First hire is ...
Read More