WORK PART AT YNYSMUEDWY LOCKS 6.2.18.

GATE-BEFORE-PAINTING

WORK PART AT YNYSMUEDWY LOCKS 6.2.18.

THIS WAS OUR SECOND WEEK AT YNYSWMEUDWY. SNOW IS FALLING, CHILDREN PLAYING….NO THAT’S SHAKIN’ STEVENS.   IT DEFINITELY SNOWED AND THOSE YOUNG AT HEART, AT LEAST, WERE WORKING. WE PAINTED THE FIVE BAR GATE LEADING TO THE CANAL BRIDGE, GOT RID OF THE VEGETATION THREATENING TO ENGULF THE LENGTHSMANS HUT BY LOWER YNYSMEUDWY LOCK AND EVEN PLANTED SOME LEFT OVER DAFFODIL BULBS WHICH MAY OR MAY NOT HAVE BEEN A GOOD IDEA  AS WE ARE IN EARLY FEB. ONLY TIME WILL TELL.

 

GATE BEFORE PAINTING                     GATE BEING TREATEDGATE, before,during and after.                                                                      AND DAFFS BEING PLANTED.                                image5

SNOW (IT IS, BELIEVE ME) ON THE GATE.

Recent Post

Work Party: Tuesday 26th May 2026

Phew, what a scorcher! With the mercury hovering around 30°C we took to the relative shade offered by ...
Read More

Summer Fair 2026

We are delighted to announce our Summer Fair for 2026. Join us at the Swansea Canal Centre for ...
Read More

Canoe and Kayak Hire 2026

A quick reminder that Canoe & Kayak Hire is open every Sunday, and continues {weather permitting!} to 27th ...
Read More

The Week Ahead: Sunday 24th – Saturday 30th May 2026

Sunday 24th May: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 19th May 2026

The weather forecast for today was dreadful so we decided to abandon our plan to line more of ...
Read More

The Week Ahead: Sunday 17th – Saturday 23rd May 2026

Sunday 17th May: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More