Work Party: Tuesday 16th April 2024

Work Party: Tuesday 16th April 2024

On another thankfully bright day, we split the group between Coed Gwilym Park and the Swansea Canal Centre in Hebron Road. There’s always lots to do at both places.

At the SCC, the tiling in the wet room, toilet and shower cubicle has been completed by Gordon and Alan T. Today the tiles were sponged down and cleaned by Alan W and they are looking really good ahead of the next phase of work.

Outside the Canal Centre Chris, Carly and Moira weeded the stone barge monument and carefully took out any grass in the wild flower garden. As we are approaching ‘No Mow May’ we cut back the grass round the barge to a width of about three inches, leaving the remainder of the meadow to proliferate.

Behind the Centre Rowan, Phil, Duncan and Lance made a start on sorting the bricks from the demolished back wall of the old building into salvageable and non-salvageable piles. The plan is to recycle the good bricks for building a perimeter wall, and other schemes. When a bonfire was lit, we knew the guys really meant business!

We hope to start work soon on building a second driveway to the parking area at the front of the Canal Centre. Traffic will be one way in, one way out, making it much safer for drivers and pedestrians. Martin and Moira made a start on the task of grass removal between the car park and the stone barge, but they forgot to take the ‘after’ photo! Let’s just say it’s a work in progress!

Meanwhile at Coed Gwilym, John Grav continued adding rubber protective strips to the bow and stern of another four canoes, to prevent damage if (or when!) they are sailed into the bank! Repurposed bicycle tyres are just the job! Also with better protection in mind, Mike F and Alan T installed rubber bumpers along the edge of the slipway to prevent the sides of the canoes from scraping on the concrete wall as paddlers climb in and out.

Bob continued his work on the big trip boat, fitting a new jockey wheel clamp and replacing screws to strengthen the hand rail fixings. Its gradually coming together and may not be too long before it gets its bottom wet!

Coffee and cake break as always was a time to natter and catch up, and the weather held until the end of the session. With spring definitely on the way we’re looking forward to getting more of our outside jobs completed ready for the summer.

Recent Post

Work Party: Tuesday 14th April 2026

A bit chilly but dry save for a couple of very brief showers for today's exertions that proved ...
Read More

The Week Ahead: Sunday 12th – Saturday 18th April 2026

Sunday 12th April: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 7th April 2026

The warmest day of the year so far and the volunteers met at the Swansea Canal Centre to ...
Read More

The Week Ahead: Sunday 5th – Saturday 11th April 2026

  Sunday 5th April: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last ...
Read More

Work Party: Tuesday 31st March 2026

Today was essentially a repeat of last week. A slightly different sub-set of volunteers continued a range of ...
Read More

The Week Ahead: Sunday 29th March – Saturday 4th April 2026

Tuesday 31st March: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More