The Pontoon is Out

Work party 20.1 (2)

The Pontoon is Out

Work party 20.1 (5)

At last, after eighteen months of looking very much like a white elephant (same colour, trunk-shaped and just as heavy) the pontoon has been used in anger. With the electric engine on ‘Nellie’ (how appropriate is that name)  and Gordon at the helm, John and Gareth towed it  down from the Aqueduct to Clydach Lock.

Work party 20.1 (2)Work party 20.1 (4)

It was used to transport the piles of mud and vegetation taken out of the canal over the last few weeks and left on the tow path verge. Now we could move it all in large quantities, far larger than is possible by wheelbarrow. In truth it was a bit like seeing a barge at work taking freight down the canal.

The elephant  works. It will be back next week, same place, same time.

 

 

Recent Post

The Week Ahead: Sunday 12th – Saturday 18th July 2026

Sunday 12th July: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 7th July 2026

On this beautiful day, the volunteers laboured under the hot summer's sun in two locations – the Buried ...
Read More

The Week Ahead: Sunday 5th – Saturday 11th July 2026

Sunday 5th July: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 30th June 2026

A big day at the Swansea Canal Centre today as we tidied up outside in preparation for the ...
Read More

The Week Ahead: Sunday 28th June – Saturday 4th July 2026

Sunday 28th June: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 23rd June 2026

Phew, what a scorcher! With the mercury creeping up to 30ºC and high humidity a smallish group of ...
Read More