The Pontoon is Out

Work party 20.1 (2)

The Pontoon is Out

Work party 20.1 (5)

At last, after eighteen months of looking very much like a white elephant (same colour, trunk-shaped and just as heavy) the pontoon has been used in anger. With the electric engine on ‘Nellie’ (how appropriate is that name)  and Gordon at the helm, John and Gareth towed it  down from the Aqueduct to Clydach Lock.

Work party 20.1 (2)Work party 20.1 (4)

It was used to transport the piles of mud and vegetation taken out of the canal over the last few weeks and left on the tow path verge. Now we could move it all in large quantities, far larger than is possible by wheelbarrow. In truth it was a bit like seeing a barge at work taking freight down the canal.

The elephant  works. It will be back next week, same place, same time.

 

 

Recent Post

Work Party: Tuesday 2nd June 2026

The weather forecast for today was grim so we decided to abandon plans for concreting and instead returned ...
Read More

The Week Ahead: Sunday 31st May – Saturday 6th June 2026

  Sunday 31st May: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last ...
Read More

Work Party: Tuesday 26th May 2026

Phew, what a scorcher! With the mercury hovering around 30°C we took to the relative shade offered by ...
Read More

Summer Fair 2026

We are delighted to announce our Summer Fair for 2026. Join us at the Swansea Canal Centre for ...
Read More

Canoe and Kayak Hire 2026

A quick reminder that Canoe & Kayak Hire is open every Sunday, and continues {weather permitting!} to 27th ...
Read More

The Week Ahead: Sunday 24th – Saturday 30th May 2026

Sunday 24th May: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More