Work Party Clydach Lock 26.5.15

Clydach lock 26.5 (13)

Work Party Clydach Lock 26.5.15

Clydach lock 26.5 (13)

Clydach lock 26.5 (11)Clydach lock 26.5 (3)

Clydach lock 26.5 (1) With the permission of the Canal and River Trust and with all H&S advice followed  and risk assessments carried out, we entered the lock chamber at the Clydach Lock  under the watchful eye of Rhodri Bowen and our leader, Gordon Walker. The buddleia roots have never been completely removed from the fissures between the beautifully built Blue Pennnant Sandstone.

 

The lock is within the first section of canal that the Society has ‘adopted’ and with the necessary funding this lock  could be fully restored with the fewest  problems. One of the three lock gates is still in situ and was worked by a pulley system as the road bridge is too wide and too close to it to allow the  axis quadrant method of opening. The two lower gates would have closed to a ‘V’ shape.

Recent Post

Work Party: Tuesday 10th February 2026

A dull and damp day today but luckily the predicted heavy rain did not materialise. The volunteers, reduced ...
Read More

The Week Ahead: Sunday 8th – Saturday 14th February 2026

Tuesday 10th February: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More

Kingfisher Fishing the Canal: Tuesday 3rd February 2026

Gary and Diane had a wonderful glimpse of a kingfisher on the canal this morning and were truly ...
Read More

Work Party: Tuesday 3rd February 2026

The weather today was cool and overcast but, contrary to the forecast, rain free. The bosses (Gordon and ...
Read More

The Week Ahead: Sunday 1st – Saturday 7th February 2026

Tuesday 3rd February: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More

Work Party: Tuesday 27th January 2026

Storm Chandra, we laugh in your face! South Wales was battered and bruised overnight, as evidenced by the ...
Read More