Work Party Clydach Lock 26.5.15

Clydach lock 26.5 (13)

Work Party Clydach Lock 26.5.15

Clydach lock 26.5 (13)

Clydach lock 26.5 (11)Clydach lock 26.5 (3)

Clydach lock 26.5 (1) With the permission of the Canal and River Trust and with all H&S advice followed  and risk assessments carried out, we entered the lock chamber at the Clydach Lock  under the watchful eye of Rhodri Bowen and our leader, Gordon Walker. The buddleia roots have never been completely removed from the fissures between the beautifully built Blue Pennnant Sandstone.

 

The lock is within the first section of canal that the Society has ‘adopted’ and with the necessary funding this lock  could be fully restored with the fewest  problems. One of the three lock gates is still in situ and was worked by a pulley system as the road bridge is too wide and too close to it to allow the  axis quadrant method of opening. The two lower gates would have closed to a ‘V’ shape.

Recent Post

Work Party: Tuesday 18th August 2026

The volunteers met today at the Buried Lock for a two-pronged attack on the canal. Firstly, James and ...
Read More

Weed Between The Locks: Monday 17th August 2026

Alan and James accompanied John as he struggled to find a way through the weed between the Buried ...
Read More

The Week Ahead: Sunday 16th – Saturday 22nd August 2026

Canoe and kayak hire is currently up and running Please check our Facebook page for updates Sunday 16th ...
Read More

Work Party: Tuesday 11th August 2026

Another scorching day saw a three-pronged attack on the canal. First up, the gardeners, Christina, Diane, Jean and ...
Read More

Canoe and Kayak Hire Recommences on Sunday 9th August

Canoe and kayak hire will recommence on Sunday 9th August Please check our Facebook page for updates Sunday ...
Read More

The Week Ahead: Sunday 9th – Saturday 15th August 2026

Boating remains suspended due to the severe lack of water. Check our Facebook page for updates. Tuesday 11th ...
Read More