Work Party Clydach Lock 26.5.15

Clydach lock 26.5 (13)

Work Party Clydach Lock 26.5.15

Clydach lock 26.5 (13)

Clydach lock 26.5 (11)Clydach lock 26.5 (3)

Clydach lock 26.5 (1) With the permission of the Canal and River Trust and with all H&S advice followed  and risk assessments carried out, we entered the lock chamber at the Clydach Lock  under the watchful eye of Rhodri Bowen and our leader, Gordon Walker. The buddleia roots have never been completely removed from the fissures between the beautifully built Blue Pennnant Sandstone.

 

The lock is within the first section of canal that the Society has ‘adopted’ and with the necessary funding this lock  could be fully restored with the fewest  problems. One of the three lock gates is still in situ and was worked by a pulley system as the road bridge is too wide and too close to it to allow the  axis quadrant method of opening. The two lower gates would have closed to a ‘V’ shape.

Recent Post

Work Party: Tuesday 18th March 2025

Another chilly but very sunny morning and another session split between the Swansea Canal Centre and Coed Gwilym ...
Read More

“Step By Step” Guides

Take a look at these fabulous “Step-By-Step” guides to exploring the sections of the Swansea Canal that remain ...
Read More

The Week Ahead: Sunday 16th – Saturday 22nd March 2025

Tuesday 18th March: Work Party: Those wishing to eat breakfast should meet at the Roadhouse Cafe in Clydach ...
Read More

White Rock Industrial Heritage Park Survey

White Rock Industrial Heritage Park Looking to the Future - Please let us have your Thoughts and Ideas. ...
Read More

Work Party: Tuesday 11th March 2025

This week the weather was bright and sunny but distinctly chilly. The volunteers attacked the canal on two ...
Read More

Canal Wildlife Walk – Saturday 26th April 2025

We are excited to be taking part in the City Nature Challenge 2025. Last year's event was a ...
Read More