WORK PARTY SOUTH OF PONTARDAWE PLAYING FIELDS: 2.5.17.

REPAIRING ERODED BANKS.

WORK PARTY SOUTH OF PONTARDAWE PLAYING FIELDS: 2.5.17.

 

We are halfway to rebuilding the tow-path edges south of the 800 yard piped section at Pontardawe Playing Fields. This  restoration will prevent further erosion of the banks  and any subsequent flooding.  Most of the material used is provided by the Canal and River Trust though much of the local Blue Tennant Sandstone is recovered from the canal itself.

IMG_20170503_085528

The base layer of sand bags filled with stone dust and cement is built up with the stone and it is a jugsaw puzzle technique from then on, finishing with the flat coping stones at the top as the ‘side pieces’.

 

 

 

 

The ‘masons’ building the wall send the messages back to the ‘quarry’ if it is ‘thin flat’ or fat flat’ stone that is required to finish the top layer, and it is up to the wheelbarrow haulers to  load the barrows with the appropriate stone for them. We hope to buy a mini-tractor soon that will be narrow enough to use the towpath and  reduce the need for manually humping  very heavy barrows of stone and lime mortar mix.

 

In the photo below, the mix has just been delivered and David, the wall builder, appears to be indicating the size of the stone he wants. Either that, or he has had a bad attack of indigestion.

 

 

 

IMG_20170502_095658195

 

IMG_20170503_085655

 

 

 

 

 

 

It is work done in the open air and in some beautiful spots. All our volunteers are made welcome and enjoy the camaraderie, banter, and refreshments provided.

On average, some twenty five men and women join us each Tuesday. There is great satisfaction to be had from improving and maintaining our wonderful canal and we are blessed  here to have such a lovely waterway in our community to use, treasure and enjoy.

Recent Post

History and Heritage Fair, 26th & 27th September 2026

The Swansea branch of the Historical Association is hosting its annual History & Heritage Fair on Saturday 26th ...
Read More

Work Party: Tuesday 8th September 2026

Today proved to be pleasantly bright and mild as the volunteers met at the Swansea Canal Centre to ...
Read More

The Week Ahead: Sunday 6th – Saturday 12th September 2026

Sunday 6th September: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 1st September 2026

Another sunny and warm day, another plan to split the relatively small group of volunteers between Pontardawe, where ...
Read More

The Week Ahead: Sunday 30th August – Saturday 5th September 2026

Sunday 30th August: Canoes & Kayaks for hire at Coed Gwilym Park, Clydach. First hire 10am, last boat ...
Read More

Work Party: Tuesday 25th August 2026

A much cooler day saw the volunteers meet at the Buried Lock and then split into two groups, ...
Read More